Valley Road
 
Project Description:
 

The Valley Road Drainage Project will provide a resolution to a long standing drainage problem on Valley Road in Woodridge Subdivision. The project consists of constructing a drainage swale on the south side of the road to convey storm water to the ditch along SR 46. Valley Road will also be resurfaced with the pavement sloped towards the south edge of the roadway, so that drainage will be carried to the proposed swale.

 

Click Here for Map of Project

 
Construction Begins:  July 2008
Substantial Completion:August 2008
Final Completion: September 2008
Construction Cost:$100,000
Funding Source: Sanitary District General Drainage Improvement

 

 

Current Road Closures:
The are no road closings associated with this project.
 
Contact Information:
Marc Maurer
Staff Engineer

812-232-4028

 