Valley Road Project
Valley Road
Project Description:
The Valley Road Drainage Project will provide a resolution to a long standing drainage problem on Valley Road in Woodridge Subdivision. The project consists of constructing a drainage swale on the south side of the road to convey storm water to the ditch along SR 46. Valley Road will also be resurfaced with the pavement sloped towards the south edge of the roadway, so that drainage will be carried to the proposed swale.
Click Here for Map of Project
| Construction Begins: | July 2008 |
| Substantial Completion: | August 2008 |
| Final Completion: | September 2008 |
| Construction Cost: | $100,000 |
| Funding Source: | Sanitary District General Drainage Improvement |
Current Road Closures:
The are no road closings associated with this project.